CUSTOMER:
ABB composites AB
ASSIGNMENT:
To design a puller that automatically lifts a mandrel into the puller. Pulls the composite pipe off the mandrel with 15 tons of force. After the removed pipe, the machine lifts the pipe onto a conveyor.
Fixed price and delivery time.